Other information:
Specification
Pressure
Output Voltage (V) [Vref=5V]
bar
[MPa (kgf/cm², psi)]
0
0 (0, 0)
0.5
140
14 (142, 2031)
2.5
280
...
Inspection
1.
TCM ground circuit test : Measure the resistance between TCM and chassis
ground. (Inspect the terminal connected to the chassis ground with the
back of harness connector as the inspection point of TCM side.)
Spec ...