Inspection with KDS/GDS
Initialization and diagnosis sequence by using KDS/GDS equipment.
The following is the summarized A/S procedure.
No.
Procedure
1
Park the vehicle on level ground.
2
...
Replacement
1.
Disconnect the negative (-) battery terminal.
2.
Recover the refrigerant with a recovery/recycling/charging station.
3.
When the engine is cool, drain the engine coolant from the radiator ...