Other information:
Inspection
•
Wrap tin foil around the end of the voltmeter test lead to prevent
damaging the heater line. Apply pressure on the tin foil with
hand and move the tin foil al ...
Inspection
1.
With the washer motor connected to the reservoir tank, fill the reservoir
tank with water.
Before filling the reservoir tank with water, check ...