Other information:
Inspection
Operating Logic Test (Manual only)
Inspect the PTC operation by confirmation logic as follows;
1.
Entering
(1)
Set the Floor mode and maximum heating position.
(2)
...
Inspection
1.
Check the battery voltage. (Low beam will be on when the battery voltage
is above 9 V.)
2.
Check the fuse and relay.
3.
Check the polarity of ballast. (The low beam will not light on in ...