Other information:
Inspection
1.
Measure the resistance between the terminals.
2.
If the measured resistance is not within specification, the blower resistor
must be replaced (after removing the resistor).
Replacement
...
Basic Service Symbols
There are five primary symbols used to complement illustrations. These symbols
indicate the part to apply such materials during service.
Symbol
Meaning
Do not reuse the part. Replace a new one.
...